Out-of-spec material ships and you find out after it is installed.
The purchase order was clear. The material that arrives is close enough that incoming inspection passes it, but in production it behaves differently. By the time the problem surfaces you have processed a week's worth of material. The rework is yours.
RadRoot sends the vendor's production lead a pulse check before each major shipment. Five questions about anything flagged during their own QC, whether any raw material inputs changed, and their confidence in this lot. The follow-up drills wherever they show uncertainty.
A Oracle Procurement Cloud - Purchase Orders Report export. One row is one purchase order line item. RadRoot reads the whole row, so every question can name something the person already knows is true.
| PO Line ID | PO Number | Vendor Name | Material Description | Material Grade | Quantity | Unit |
|---|---|---|---|---|---|---|
| PO-2026-1847-003 | PO-2026-1847 | Hartwell Metals Supply | Aluminum bar stock | 6061-T6 | 2400 | kg |
| PO-2026-1851-001 | PO-2026-1851 | Denali Steel Works | Cold rolled steel sheet | A1008 | 5000 | kg |
| PO-2026-1855-002 | PO-2026-1855 | Summit Alloys Inc | Stainless steel rod | 304L | 1800 | kg |
| PO-2026-1859-001 | PO-2026-1859 | Cascade Polymers LLC | Nylon resin pellets | PA66-GF30 | 800 | kg |
| PO-2026-1863-004 | PO-2026-1863 | Northern Forge Supply | Carbon steel plate | A36 | 3200 | kg |
First 5 of 20 rows, first 7 of 13 columns. RadRoot interviewed the production lead on each row, and 6 of 20 answered.
Six options every time, including the ones that reflect badly on whoever sent it. Each question was written after the answer above it landed.
Written for whoever ran the campaign. The respondent never sees it.
The vendor switched to a secondary supplier for the PA66-GF30 resin due to a lead time issue. That supplier has not provided this grade in eighteen months. Standard QC was performed but no batch comparison test was run. The vendor disclosed the substitution for the first time in this interview, three days before shipment. They are moderately confident the material will perform but acknowledge it might behave differently in molding. You have no advance notice and no independent data on how this lot compares to your normal feed stock.
The raw stock for this lot came from a secondary supplier who has not provided this grade in eighteen months.
The respondent expects the material to be within spec but acknowledges it might behave slightly differently in production.
Standard incoming inspection was performed but no batch comparison test was run against the primary supplier's material.
The supplier did not disclose the substitution until this interview, three days before the scheduled shipment.
The substitution was driven by a lead time issue and the secondary supplier is approved for this material.