A substitution gets installed before anyone checks the spec sheet.
Your lumber supplier sends framing material that is structurally close but a slightly different dimension than spec'd. The crew installs it before anyone checks. When the inspection happens, there is a problem. The supplier says it was listed as a comparable substitute in the manifest, buried in the paperwork. You absorb the rework cost and the schedule hit.
RadRoot sends your supplier's account manager a pre-delivery pulse before each major shipment. Five questions about what is shipping as specified, what is substituted, and whether any dimensions or grades differ from the original order.
A Procore - Material Deliveries Log export. One row is one scheduled material delivery. RadRoot reads the whole row, so every question can name something the person already knows is true.
| Delivery ID | Project Code | Site Address | Delivery Date | Material Category | Item Description | Quantity |
|---|---|---|---|---|---|---|
| DLV-2026-0847 | RC-4402 | 1820 Westbrook Lane, Millerton | 2026-03-18 | Structural Lumber | 2x10 Douglas Fir Joists, Grade 2 | 420 LF |
| DLV-2026-0903 | RC-4411 | 550 Industrial Parkway, Denham | 2026-03-22 | Engineered Wood | TJI 210 I-Joists 16 inch, 24 ft | 85 EA |
| DLV-2026-0912 | RC-4388 | 72 Maple Ridge Court, Southdale | 2026-03-25 | Concrete & Masonry | 8x8x16 CMU Standard Block | 2400 EA |
| DLV-2026-0928 | RC-4415 | 2900 Commerce Drive, Lakewood | 2026-03-27 | Steel Framing | Metal Studs 20ga 3.625 inch | 1850 LF |
| DLV-2026-0931 | RC-4402 | 1820 Westbrook Lane, Millerton | 2026-03-29 | Roofing | OSB Sheathing 7/16 inch 4x8 | 110 SH |
First 5 of 20 rows, first 7 of 14 columns. RadRoot interviewed the supplier account manager on each row, and 6 of 20 answered.
Six options every time, including the ones that reflect badly on whoever sent it. Each question was written after the answer above it landed.
Written for whoever ran the campaign. The respondent never sees it.
Lisa disclosed a manufacturer substitution that would have gone unannounced. The alternate track matches dimensions and gauge, and she claims it meets the same ASTM standards, but she would have considered this a routine swap and not flagged it. The products may indeed be equivalent, but you now have the option to verify that claim before installation rather than discovering a mismatch at inspection. The delivery timeline is unaffected.
A different manufacturer's track product will be shipped due to depleted primary stock.
The alternate track matches the specified dimensions, gauge, and is considered a direct industry equivalent.
The supplier does not believe engineer review is necessary for this substitution.
The supplier would not have disclosed the manufacturer change without this pulse check.
The delivery will arrive on schedule with the alternate product ready to ship.
Fifteen minutes, screen to screen. We run your real question through RadRoot while you watch, and you leave with the follow-up it wrote and a price.